Marchés publics Canada

UPS Batteries - Millhaven Institution

Organisme
Services de passation de marchés et de matériel - Ontario
Publié le
2023-06-19
Clôture
2023-07-12 10:00:00
Catégorie
Construction
Région de livraison
Kingston
Méthode
Concurrentielle - Invitation ouverte à soumissionner
Référence
cb-6546-76189681
N° de sollicitation
21421-23-4419876-001-001
UNSPSC
Batteries, cellules et accessoires ; Éclairages de secours et accessoires
Voir l'avis officiel et les documents →

Description

This requirement is for: The Correctional Service of Canada, Millhaven Institution. Trade agreement: Canadian Free Trade Agreement (CFTA), Canada Korea Trade Agreement (CKTA), Canada free trade agreements with Chile/Colombia/Honduras/Panama. Tendering procedures: All interested suppliers may submit a bid. Competitive Procurement Strategy: lowest priced compliant bid. Set-aside under the Procurement Strategy for Indigenous Business: This procurement is not subject to any set-asides for Indigenous Suppliers. Comprehensive Land Claim Agreement: This procurement is not subject to a Comprehensive Land Claims Agreement. Security Requirements: This contract does not include security requirements. Nature of Requirements: The following is a summary of the statement of work for this requirement. The Correctional Service of Canada requires the services of a qualified contractor for: Replacement of all Uninterrupted Power Supply (UPS) and Always On batteries at Millhaven Institution. The current system batteries have exceeded their life cycle, and this system is critical in maintaining the door and /barrier control as well as the emergency lighting during a power failure. Objectives: This work will ensure the Always On UPS system will return to normal operation. The contractor must ensure all systems are working and up to CSA/TSSA standards. Deliverables: The contractor must perform the following: • Supply and Install of Seventy-Five (75): SLA12-75 or equivalent batteries; • Supply and Install of One Hundred and Forty (140): S12V285 or equivalent batteries; • Replace batteries in the following areas: A Unit, T Building, E Unit, J Unit, S Building (Hospital), U building and Y Unit (RTC); • Ensure all systems are returned to normal operating condition; • Ensure all removed batteries are disposed of in an environmentally friendly manner, according to all required regulations; The contractor must follow all CSA/TSSA standards. Any conditions for participation of suppliers not specified in solicitation documentation: none. Estimated quantity of commodity: see solicitation document statement of work and basis of payment. Duration of Contract and Time Frame for Delivery: Delivery Date: All the deliverables must be received on or before September 28th, 2023.
Recevez les nouveaux appels d'offres par courriel
Alertes par mots-clés, gratuites pendant la bêta : au plus un courriel par jour, désabonnement en un clic. Créer mon alerte →